4. Coastal Margins 4.1 Seaward boundary with vegetation considered as the coastal margin (10% DR) RM1,047/km 4.2 Tide level marking by wading through it (20% DR) RM2,095/km
5. Final Reports 5 – 10% of Total Cost
6. Miscellaneous (e.g., airfare, transport for survey team, etc.) RM1,000.00/day