Official Website

Malaysia Marine Department

Payment is Based on the Location and Duration of the Study

Hydrographic Services

Hydrographic Survey Fee Scale

1. Mobilization/Demobilization of Work
        1.1 Fuel RM0.90/km
        1.2 Survey Vessel (KJLS MERPATI) RM3,650.00/day

2. Survey Control
         2.1 Cross Control (15% DR) RM1,571.00/station
         2.2 Vertical Control (15% DR) RM1,571.00/station

3. Bathymetry
         3.1 Bathymetry (basic pattern coverage) RM326.87/km
         3.2 Survey (sandbanks, wrecks, etc.) RM436.00/km
         3.3 Consumables (echo sounder material) RM350.00/roll

4. Coastal Margins
         4.1 Seaward boundary with vegetation considered as the coastal margin (10% DR) RM1,047/km
         4.2 Tide level marking by wading through it (20% DR) RM2,095/km

5. Final Reports 5 – 10% of Total Cost

6. Miscellaneous (e.g., airfare, transport for survey team, etc.) RM1,000.00/day

7. Standby/bad weather/additional day (for surveys exceeding seven (7) days) RM10,477.00/day

For calculation: * Daily Rate = RM10,470.00