Hydrographic Survey Fee Scale
1. Mobilization/Demobilization of Work
1.1 Fuel RM0.90/km
1.2 Survey Vessel (KJLS MERPATI) RM3,650.00/day
2. Survey Control
2.1 Cross Control (15% DR) RM1,571.00/station
2.2 Vertical Control (15% DR) RM1,571.00/station
3. Bathymetry
3.1 Bathymetry (basic pattern coverage) RM326.87/km
3.2 Survey (sandbanks, wrecks, etc.) RM436.00/km
3.3 Consumables (echo sounder material) RM350.00/roll
4. Coastal Margins
4.1 Seaward boundary with vegetation considered as the coastal margin (10% DR) RM1,047/km
4.2 Tide level marking by wading through it (20% DR) RM2,095/km
5. Final Reports 5 – 10% of Total Cost
6. Miscellaneous (e.g., airfare, transport for survey team, etc.) RM1,000.00/day
7. Standby/bad weather/additional day (for surveys exceeding seven (7) days) RM10,477.00/day
For calculation: * Daily Rate = RM10,470.00