Notice No. Tittle Date
01/2012 KERJA-KERJA LETUPAN PESISIR PANTAI BAGI PEMBANGUNAN TERMINAL LAUT DALAM BEBAS DI PERAIRAN PENGERANG, JOHOR/ SHORELINE BLASTING WORK FOR INDEPENDENT DEEPWATER TERMINAL IN THE PENGERANG WATERS, JOHOR 2 JANUARI 2012
02/2012 PEMBETULAN BAGI PEKELILING PELABUHAN NO. 01/2012 - PERHATIAN/ CORRIGENDUM TO PORT CIRCULAR NO.01/2012 – CAUTIONR 6 JANUARI 2012
03/2012 KERJA-KERJA PEMBINAAN DI PELABUHAN TANJUNG LANGSAT, JOHOR – AKTIVITI-AKTIVITI PENGERUKAN DAN PELUPUSAN/ CONSTRUCTION WORKS AT TANJUNG LANGSAT PORT, JOHOR - DREDGING AND DUMPING ACTIVITIES 31 JANUARI 2012
04/2012 AKTIVITI PENYIASATAN TANAH DI HAD PELABUHAN PASIR GUDANG, JOHOR/ SOIL INVESTIGATION ACTIVITIES IN THE PASIR GUDANG PORT LIMITS, JOHOR 10 FEBRUARI 2012
05/2012 PEMBANGUNAN TERMINAL LAUT DALAM BEBAS – AKTIVITI-AKTIVITI PENGERUKAN DAN PELUPUSAN/ DEVELOPMENT OF THE INDEPENDENT DEEPWATER TERMINAL – INSTALLATION OF LIGHT BUOYS 16 FEBRUARI 2012
06/2012 KERJA PEMASANGAN SISTEM KABEL DASAR LAUT ASIA SUBMARINE CABLE EXPRESS (ASE) DI LUAR PANTAI TIMUR NEGERI JOHOR – LANJUTAN TEMPOH BEKERJA DAN PENAMBAHAN VESEL BEKERJA/ SUBMARINE CABLE INSTALLATION WORKS FOR ASIA SUBMARINE CABLE EXPRESS (ASE) OFF THE EASTERN COAST OF THE STATE OF JOHOR – DURATION OF WORKS EXTENDED AND ADDITIONAL WORKING VESSEL 02 MAC 2012
07/2012 PENEMPATAN BARU ALAT BANTUAN PELAYARAN DI HAD PELABUHAN TANJUNG PELEPAS/ NEWLY ESTABLISHED OF AIDS TO NAVIGATION IN THE PORT LIMITS OF TANJUNG PELEPAS 07 MAC 2012
08/2012 KERJA-KERJA PENGERUKAN UTAMA DAN PELUPUSAN DI PELABUHAN TANJUNG LANGSAT, JOHOR/ CAPITAL DREDGING AND DUMPING ACTIVITIES AT TANJUNG LANGSAT PORT, JOHOR 27 MAC 2012
09/2012 PEMBANGUNAN TERMINAL LAUT DALAM BEBAS – VESEL TAMBAHAN YANG TERLIBAT DALAM AKTIVITIAKTIVITI PENGERUKAN DAN PELUPUSAN/ DEVELOPMENT OF THE INDEPENDENT DEEPWATER TERMINAL – ADDITIONAL VESSEL ENGAGED IN DREDGING AND DUMPING ACTIVITIES 27 MAC 2012
10/2012 KERJA PEMASANGAN SISTEM KABEL DASAR LAUT ASIA SUBMARINE CABLE EXPRESS (ASE) DI LUAR PANTAI TIMUR NEGERI JOHOR – LANJUTAN TEMPOH BEKERJA/ SUBMARINE CABLE INSTALLATION WORKS FOR ASIA SUBMARINE CABLE EXPRESS (ASE) OFF THE EASTERN COAST OF THE STATE OF JOHOR – DURATION OF WORKS EXTENDED 28 MAC 2012
11/2012 KERJA PENYELAMAN DAN SURVEI BANGKAI KAPAL DI ALUR PELAYARAN PELABUHAN TANJUNG PELEPAS/ WRECKS SURVEY AND DIVING WORKS AT PORT OF TANJUNG PELEPAS CHANNEL 30 MAC 2012
12/2012 SURVEI HIDROGRAFI DI KAWASAN SUNGAI-SUNGAI DI TENGGARA NEGERI JOHOR/ HYDROGRAPHIC SURVEY OF RIVERS IN THE SOUTH EASTERN COAST OF JOHOR 09 APRIL 2012
15/2012 PEMBINAAN ALUR KELUAR LAUT DI SELAT JOHOR BARAT/ CONSTRUCTION OF MARINE OUTFALL IN THE WEST JOHOR STRAITS 03 MEI 2012