| Notice
No. |
Tittle |
Date |
| 01/2008 |
PENGERUKAN
PENYELENGGARAAN DI PELABUHAN JOHOR, PASIR GUDANG /
MAINTENANCE DREDGING AT JOHOR PORT, PASIR GUDANG |
4 JANUARI 2008 |
| 02/2008 |
KERJA-KERJA
SURVEI LALUAN DAN PEMASANGAN KABEL DASAR LAUT DILUAR HAD PELABUHAN PASIR
GUDANG, JOHOR /
ROUTE SURVEY AND SUBMARINE CABLE LAYING WORKS OFF PASIR GUDANG PORT
LIMITS, JOHOR |
4 JANUARI 2008 |
| 03/2008 |
SIASATAN
TANAH DIDALAM HAD PELABUHAN TANJUNG PELEPAS, JOHOR - LANJUTAN TEMPOH BEKERJA
/
SOIL INVESTIGATIONS IN THE TANJUNG PELEPAS PORT LIMITS, JOHOR - DURATION
OF WORKS EXTENDED |
18 JANUARI 2008 |
| 04/2008 |
KERJA-KERJA
DI LIMBUNGAN MALAYSIA MARINE & HEAVY ENGINEERING (MMHE, PASIR GUDANG, JOHOR
/
DREDGING WORKS AT MALAYSIA MARINE HEAVY & ENGINEERING (MMHE)
DOCKYARD, PASIR GUDANG, JOHOR |
01 FEBUARI 2008 |
| 05/2008 |
KERJA-KERJA
KABEL DASAR LAUT DI PERSISIRAN HAD PELABUHAN PASIR GUDANG, JOHOR /
SUBMARINE CABLE REPAIR WORKS ALONG THE PASIR GUDANG PORT LIMITS, JOHOR |
05 FEBUARI 2008 |
| 06/2008 |
KERJA-KERJA
KABEL DASAR LAUT DI PERSISIRAN HAD PELABUHAN PASIR GUDANG, JOHOR /
SUBMARINE CABLE REPAIR WORKS ALONG THE PASIR GUDANG PORT LIMITS,
JOHOR |
06 FEBUARI 2008 |
| 07/2008 |
KERJA-KERJA
PEMASANGAN KABEL DASAR LAUT DILUAR PANTAI MERSING, JOHOR /
SUBMARINE CABLE LAYING WORKS OFF THE COAST OF MERSING, JOHOR |
11 FEBUARI 2008 |
| 08/2008 |
KERJA-KERJA
PEMBINAAN MARIN DI JAMBATAN SULTAN ISMAIL DI SUNGAI MUAR, JOHOR /
MARINE CONSTRUCTION WORKS AT THE SULTAN ISMAIL BRIDGE IN THE MUAR PORT LIMITS,
JOHOR |
21 FEBUARI 2008 |
| 09/2008 |
PENGERUKAN
PENYELENGGARAAN DI PELABUHAN JOHOR, PASIR GUDANG - TAMBAHAN VESEL KERJA/
MAINTENANCE DREDGING AT JOHOR PORT, PASIR GUDANG- ADDITIONAL WORKING VESSEL |
21 FEBUARI 2008 |
| 10/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DIPESISIRAN HAD PELABUHAN PASIR GUDANG, JOHOR
- LANJUTAN TEMPOH BEKERJA/
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS, JOHOR - WORK
DURATION EXTENDED |
28 FEBUARI 2008 |
| 11/2008 |
SIASATAN
TANAH DI PELABUHAN MERSING, JOHOR /
SOIL INVESTIGATIONS IN THE PORT OF MERSING, JOHOR |
28 FEBUARI 2008 |
| 12/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DIPESISIRAN HAD PELABUHAN PASIR GUDANG, JOHOR
/
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS, JOHOR |
28 FEBUARI 2008 |
| 13/2008 |
KERJA-KERJA
PEMERIKSAAN SELEPAS PEMASANGAN DAN PENANAMAN KABEL DASAR LAUT DI LUAR HAD
PELABUHAN PASIR GUDANG, JOHOR /
SUBMARINE CABLE POST LAY INSPECTION AND BURIAL WORKS OFF PASIR GUDANG PORTS
LIMITS, JOHOR |
04 MAC 2008 |
| 14/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DIPESISIRAN HAD PELABUHAN PASIR GUDANG, JOHOR
- TAMBAHAN VESEL-VESEL KERJA/
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS, JOHOR - ADDTIONALS
WORK VESSELS |
06 MAC 2008 |
| 15/2008 |
KAJIAN
MARIN DIDALAM HAD-HAD PELABUHAN TANJUNG PELEPAS DAN JOHOR BAHRU/
MARINE RESEARCH IN THE TANJUNG PELEPAS AND JOHOR BANRU PORT LIMITS |
07 MAC 2008 |
| 16/2008 |
OPERASI
MENGAIT LALUAN SEBELUM PEMASANGAN KABEL DASAR LAUT DI LUAR PANTAI MERSING,
JOHOR/
SUBMARINE CABLE PRE-LAY GRAPNEL RUN OPERATIONS OFF THE COAST OF MERSING,
JOHOR |
13 MAC 2008 |
| 17/2008 |
SIASATAN
TANAH DI PELABUHAN JOHOR BAHRU - LELURUS BANDAR/
SOIL INVESTIGATIONS IN THE PORT OF JOHOR BAHRU - TOWN REACH |
13 MAC 2008 |
| 18/2008 |
KERJA-KERJA
MEMASANG BOYA TAMBATAN DI HAD PELABUHAN TANJUNG PELEPAS, JOHOR/
MOORING BUOY INSTALLATION WORKS IN THE TANJUNG PELEPAS PORT LIMITS, JOHOR |
28 MAC 2008 |
| 19/2008 |
HARI
KEPUTERAAN DULI YANG MAHA MULIA BAGINDA SULTAN JOHOR/
HIS MAJESTY THE SULTAN OF JOHOR BIRTHDAY |
03 APRIL 2008 |
| 20/2008 |
LATIHAN
MENEMBAK PELURU HIDUP DARI BUMI KE UDARA DI TANJUNG LOGOK, KOTA TINGGI,
JOHOR/
LIVE SURFACE TO AIR FIRING EXERCISE AT TANJUNG LOGOK, KOTA TINGGI, JOHOR |
10 APRIL 2008 |
| 21/2008 |
PEMASANGAN
BOYA PEMROFIL ARUS DOPPLER AKUSTIK (ADCP) DILUAR PANTAI MERSING, JOHOR/
INSTALLATION OF ACOUSTIC DOPPLER CURRENT PROFILER (ADCP) BUOYS OFFSHORE
MERSING, JOHOR |
10 APRIL 2008 |
| 22/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DI PERSISIRAN HAD PELABUHAN PASIR GUDANG, JOHOR/
SUBMARINE CABEL REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS, JOHOR |
29 APRIL 2008 |
| 23/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DI PERSISIRAN HAD PELABUHAN PASIR GUDANG, JOHOR
- PEMINDAHAN KAWASAN BEKERJA
SUBMARINE CABEL REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS, JOHOR - RELOCATION
OF WORKING AREA |
13 MEI 2008 |
| 24/2008 |
KERJA-KERJA
PEMASANGAN DAN PENANAMAN KABEL DASAR LAUT - SELAT SINGAPURA DAN PANTAI TIMUR
NEGERI JOHOR
SUBMARINE CABEL LAYING AND BURIAL WORKS - SINGAPORE STRAITS AND EAST COST
OF JOHOR - RELOCATION OF WORKING AREA |
13 MEI 2008 |
| 25/2008 |
KERJA-KERJA
PENGERUKAN DI SUNAGI MUAR, JOHOR - TEMPOH KERJA DILANJUTKAN
DREDGING WORKS IN THE MUAR RIVER, JOHOR. - DURATION OF WORKS EXTENDED |
26 MEI 2008 |
| 26/2008 |
PENGERUKAN
PENYELENGGARAAN DI PELABUHAN JOHOR , PASIR GUDANG - TEMPOH KERJA DILANJUTKAN
DAN TAMBAHAN VESEL-VESEL BEKERJA
MAINTENANCE DREDGING AT JOHOR PORT , PASIR GUDANG - DURATION OF WORKS EXTENDED
AND ADDITIONAL WORKING VESSELS |
16 JUN 2008 |
| 27/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DI PERSISIRAN HAD PELABUHAN PASIR GUDANG , JOHOR
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS , JOHOR |
19 JUN 2008 |
| 28/2008 |
SIASATAN
TANAH DI PULAU SIBU , MERSING , JOHOR
SOIL INVESTIGATIONS AT PULAU SIBU , MERSING , JOHOR |
20 JUN 2008 |
| 30/2008 |
VESEL
DI LUAR KEUPAYAAN "CHAMPION BRALI" BERSAUH DI LUAR HAD PELABUHAN PASIR GUDANG
DISABLED VESSEL "CHAMPION BRALI" ANCHORED OFF PASIR GUDANG PORT LIMITS |
25 JUN 2008 |
| 31/2008 |
KERJA-KERJA
PEMULIHAN KABEL DASAR LAUT DI PERSISIRAN HAD PELABUHAN PASIR GUDANG , JOHOR
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS , JOHOR |
10 JULAI 2008 |
| 32/2008 |
KERJA-KERJA
PEMASANGAN KABEL DASAR LAUT DI LUAR HAD PELABUHAN PASIR GUDANG , JOHOR
SUBMARINE CABLE LAYING WORKS OFF PASIR GUDANG PORT LIMITS , JOHOR |
16 JULAI 2008 |
| 33/2008 |
WREK
BARU DI KUALA SUNGAI SANTI DI DALAM HAD PELABUHAN PASIR GUDANG , JOHOR
NEW WRECK AT SUNGAI SANTI RIVER MOUTH IN PASIR GUDANG PORT LIMITS , JOHOR |
1 OGOS 2008 |
| 34/2008 |
HARI
KEMERDEKAAN MALAYSIA
MALAYSIA NATIONAL DAY |
28 OGOS 2008 |
| 35/2008 |
KERJA-KERJA
PEMBAIKKAN KABEL DASAR LAUT DIPERSISIRAN HAD PELABUHAN PASIR GUDANG , JOHOR
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS , JOHOR |
4 SEPT 2008 |
| 36/2008 |
KERJA-KERJA
PEMBAIKKAN KABEL DASAR LAUT DIPERSISIRAN HAD PELABUHAN PASIR GUDANG , JOHOR
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS , JOHOR |
4 SEPT 2008 |
| 37/2008 |
KERJA-KERJA
PEMBAIKKAN KABEL DASAR LAUT DIPERSISIRAN HAD PELABUHAN PASIR GUDANG , JOHOR
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS , JOHOR |
22 OKT 2008 |
| 38/2008 |
SEA
MALAYSIA RALLY DI TELUK DANGA , JOHOR BAHRU DAN PENGWUJUDAN KAWASAN-KAWASAN
LABUHAN SEMENTARA
SEA MALAYSIA RALLY AT DANGA BAY , JOHOR BAHRU AND ESTABLISHMENTS OF TEMPORARY
ANCHORAGE AREAS |
23 OKT 2008 |
| 39/2008 |
LATIHAN
MENEMBAK PELURU HIDUP DARI BUMI KE UDARA DI TANJUNG LOGOK , KOTA TINGGI
, JOHOR
LIVE SURFACE TO AIR FIRING EXERCISE AT TANJUNG LOGOK , KOTA TINGGI , JOHOR |
23 OKT 2008 |
| 40/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DIPERSISIRAN HAD PELABUHAN PASIR GUDANG , JOHOR
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS , JOHOR |
7 NOV 2008 |
| 41/2008 |
PEMBANGUNAN
PULAU TEBUS GUNA DI HAD PELABUHAN TANJUNG PELEPAS , JOHOR - PENGWUJUDAN
KAWASAN KERJA
DEVELOPMENT OF THE RECLAIMED ISLAND IN THE TANJUNG PELEPAS PORT LIMITS -
WORKING AREA ESTABLISHED |
14 NOV 2008 |
| 42/2008 |
PEMBANGUNAN
"WATERFRONT PRECINT" NUSAJAYA DI HAD PELABUHAN JOHOR BAHRU - PENGWUJUDAN
KAWASAN KERJA
DEVELOPMENT OF THE NUSAJAYA WATERFRONT PRECINT IN THE JOHOR BAHRU PORT LIMITS
- WORKING AREA ESTABLISHED |
20 NOV 2008 |
| 43/2008 |
CADANGAN
PEMBANGUNAN TAMBANGAN JARI BARAT DI MALAYSIA MARINE AND HEAVY ENGINEERING
(MMHE), DI HAD PELABUHAN PASIR GUDANG - KAWASAN KERJA DIWUJUDKAN
PROPOSED DEVELOPMENT OF WEST FINGER PIER AT MALAYSIA MARINE AND HEAVY ENGINEERING
(MMHE), IN THE PASIR GUDANG PORT LIMITS - WORKING AREA ESTABLISHED |
25 NOV 2008 |
| 44/2008 |
PEMBETULAN
KEPADA PEKELILING PELABUHAN NO 43/2008 BERTARIKH 25 NOVEMBER 2008
CORRIGENDUM TO PORT CIRCULAR NO 43/2008 DATED 25 NOVEMBER 2008 |
1 DEC 2008 |
| 45/2008 |
LARANGAN
BAGI VESEL-VESEL BUNKER BERBENDERA ASING BERSAIZ KONVENSYEN YANG MEMILIKI
SIJIL STATUTORI BUKAN KONVENSYEN BEROPERASI MEMBEKAL BAHAN API DI DALAM
PERAIRAN NEGERI JOHOR
PROHIBITION FOR CONVENTION SIZED FOREIGN FLAGGED BUNKER VESSELS HOLDING
NON-CONVENTION STATUTORY CERTIFICATES FROM BUNKERING OPERATIONS IN JOHOR
STATE WATERS |
9 DEC 2008 |
| 46/2008 |
PEMBANGUNAN
PENGKALAN POLIS MARIN DIRAJA MALAYSIA DI SUNGAI PULAI , JOHOR - PENGISYTIHARAN
KAWASAN KERJA
DEVELOPMENT OF THE ROYAL MALAYSIAN MARINE POLICE BASE IN SUNGAI PULAI ,
JOHOR - DECLARATION OF WORKING AREA |
9 DEC 2008 |
| 47/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DIPERSISIRAN HAD PELABUHAN PASIR GUDANG , JOHOR
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS , JOHOR |
16 DEC 2008 |
| 48/2008 |
KERJA-KERJA
PEMBAIKAN KABEL DASAR LAUT DI LUAR PANTAI TIMUR NEGERI JOHOR
SUBMARINE CABLE REPAIR WORKS OFF THE PASIR GUDANG PORT LIMITS , JOHOR |
16 DEC 2008 |
| 49/2008 |
PENGERUKAN
PENYELENGGARAAN DI PELABUHAN TANJUNG PELEPAS , JOHOR
MAINTENANCE DREDGING AT THE PORT OF TANGJUNG PELEPAS , JOHOR |
24 DEC 2008 |
| 50/2008 |
PENGERUKAN
DI MMHE DI DALAM HAD PELABUHAN PASIR GUDANG , JOHOR
DREDGINF WORKS AT MMHE IN THE PASIR GUDANG PORT LIMITS , JOHOR |
24 DEC 2008 |