| Notice
No. |
Tittle |
Date |
| PELABUHAN
KLANG / PORT KLANG , PORT DICKSON , MELAKA |
| 18/2010 |
KERJA-KERJA PENAMBAKAN DAN PENGERUKAN PASIR DI DERMAGA CT6, CT7, CT8 DAN CT9 DI PELABUHAN BARAT, PELABUHAN KELANG. MALAYSIA / CONSTRUCTION AND COMPLETION OF LAND RECLAMATION AND DREDGING WORKS AT CT6,CT7.CT8 AND CT9 WHARFT AT WESTPORTS. PORT KELANG.MALAYSIA |
16 November 2010 |
| 17/2010 |
KERJA-KERJA PENGERUKAN DI DERMAGA CT6 DAN LALUAN MASUK DI WESTPORTS PELABUHAN KELANG, MALAYSIA / DREDGING WORKS AT CT6 WHARF AND ACCESS BRIDGE AT WESTPORTS, PORT KELANG.MALAYSIA |
15 November 2010 |
| 16/2010 |
RAJA MUDA SELANGOR INTERNATIONAL REGATTA 2010 / RAJA MUDA SELANGOR INTERNATIONAL REGATTA 2010 |
10 November 2010 |
| 15/2010 |
LOKASI-LOKASI MENJALANKAN AKTIVITI BUNKERING DI LUAR BATAS PELABUHAN, PELABUHAN KLANG / OUTER PORT LIMIT(OPL) PORT KLANG POSITIONS FOR BUNKERING ACTIVITIES |
28 SEPTEMBER 2010 |
| 14/2010 |
KERJA-KERJA MENGAPUNG KAPAL ‘JIANG SHENG NO. 18’ KARAM DI PERAIRAN PORT DICKSON / SALVAGE WORKS FOR SHIP ‘JIANG SHENG NO. 18’ SINKING AT PORT DICKSON WATERS |
17 SEPTEMBER 2010 |
| 13/2010 |
KERJA-KERJA PENGERUKAN DI STESEN JANAELEKTRIK SULTAN SALAHUDDIN ABDUL AZIZ, KAPAR / MAINTENANCE DREDGING OF SEABED AT STESEN JANAEKTRIK SULTAN SALAHUDDIN ABDUL AZIZ, KAPAR |
16 AUGUST 2010 |
| 12A/2010 |
KERJA-KERJA PENGERUKAN DIHADAPAN DERMAGA NORTHPORT (DERMAGA 8 HINGGA 25) DAN DIHADAPAN DERMAGA SOUTHPOINT (DERMAGA 1 HINGGA 7A) DI PELABUHAN KELANG / DREDGING WORKS AT NORTHPORT WHARVES FRONTAGE (WHARVES 8 TO 25)
AND SOUTH POINT FRONTAGE (WHARVES 1 TO 7A) AT NORTHPORT (MALAYSIA) BHD AT PORT KELANG |
24 SEPTEMBER 2010 |
| 12/2010 |
KERJA-KERJA PENGERUKAN DIHADAPAN DERMAGA NORTHPORT (DERMAGA 8 HINGGA 25) DAN DIHADAPAN DERMAGA SOUTHPOINT (DERMAGA 1 HINGGA 7A) DI PELABUHAN KELANG / DREDGING WORKS AT NORTHPORT WHARVES FRONTAGE (WHARVES 8 TO 25) AND SOUTH POINT FRONTAGE (WHARVES 1 TO 7A) AT NORTHPORT (MALAYSIA) BHD AT PORT KELANG |
14 JULAI 2010 |
| 11/2010 |
KERJA-KERJA PENGERUKAN KECEMASAN DI PORT KLANG CRUISE CENTRE, PELABUHAN KELANG / EMERGENCY DREDGING WORKS FOR APPROCHES AND TURNING BASIN TO PORT KLANG CRUISE CENTRE, PORT KLANG |
8 JULAI 2010 |
| 09/2010 |
KERJA-KERJA MERENTANGAN KABEL DASAR LAUT DARI STESEN JANALETRIK, KAPAR KE PULAU KETAM, PELABUHAN KELANG / SUBMARINE CABLE LAYING WORK FROM ELECTRIC POWER STATION, KAPAR TO PULAU KETAM, PORT KELANG |
25 JUNE 2010 |
| 08/2010 |
UJIAN LAUT KEATAS PERALATAN WINCH DAN CABLE HAULING MACHINE DIATAS TONGKANG “CABLE EMPOWERED” DENGAN DIBANTU SEBUAH BOT TUNDA “JANET” / SEA TRIAL FOR NEWLY INSTALLED WINCH AND CABLE HAULING MACHINE FOR CABLE LAYING BARGE “CABLE EMPOWERED” WITH ASSIST TUG “JANET” |
7 JUNE 2010 |
| 07/2010 |
PELANTAR MINYAK “SEDCO 700” MELABUH TUNGGU DI KAWASAN LABUHAN PORT DICKSON, MALAYSIA / LAY UP POSITION OF OIL RIG “SEDCO 700” AT ANCHORAGE AREA OF PORT DICKSON, MALAYSIA |
15 APRIL 2010 |
| 06/2010 |
PENEMPATAN SEMULA DUA TANDARAH SUAR DI TANJUNG MAHANG, PINTU GEDONG,PELABUHAN KELANG. MALAYSIA / RE-ESTABLISHED TWO LEADING LIGHT AT TANJUNG MAHANG, PINTU GEDONG, PORT KELANG.MALAYSIA |
30 MARCH 2010 |
| 05/2010 |
BOT PENUMPANG “AMAN EXPRESS” TERBAKAR DAN TENGGELAM DI KAWASAN SUNGAI KELANG, PELABUHAN KLANG.MALAYSIA / PASSENGER BOAT “AMAN EXPRESS” BURNED AND SUNK IN KELANG RIVER AREA, PORT KELANG.MALAYSIA |
18 MARCH 2010 |
| 04/2010 |
PEMBUKAAN MARINA AWAM DI PULAU INDAH / OPENING OF PUBLIC MARINA AT PULAU INDAH |
26 JANUARI 2010 |
| 03/2010 |
PEMBUKAAN MARINA PULAU INDAH UNTUK
BEROPERASI / OPENING OF MARINA PULAU INDAH FOR
OPERATIONAL ACTIVITIES |
21 JANUARI 2010 |
| 02/2010 |
PENEMPATAN PELAMPUNG PANDU WARNA MERAH (TENTERAM, TENGAH DAN
TERUSAN) KE LOKASI BARU DI ALUR PELAYARAN SELATAN, PINTU GEDONG, PELABUHAN KELANG. MALAYSIA / RELOCATE TO A NEW POSITION OF STARBOARD HAND BUOY (TENTERAM, TENGAH AND TERUSAN) AT SOUTHERN
APPROACH NAVIGATION CHANNEL, PINTU GEDONG, PORT KELANG.MALAYSIA |
14 JANUARI 2010 |
| 01/2010 |
PENEMPATAN SEMULA PELAMPUNG PANDU
WARNA HIJAU (SELAT DAN BUAS-BUAS) DI ALUR PELAYARAN SELATAN, PINTU GEDONG, PELABUHAN KELANG. MALAYSIA / RESTORED OF STARBOARD HAND BUOY
(SELAT AND BUAS-BUAS) AT SOUTHERN APPROACH NAVIGATION CHANNEL, PINTU GEDONG, PORT KELANG.MALAYSIA |
14 JANUARI 2010 |