| Notice
No. |
Title |
Date |
| 1/2009(P) |
LIST
OF SARAWAK NOTICES TO MARINERS STILL IN FORCE ON 1ST OF
JANUARY 2009 |
2nd JANUARY 2009 |
| 2/2009(T) |
SEISMIC
SURVEY, OFFSHORE SARAWAK |
2nd JANUARY 2009 |
| 3/2009(T) |
TANJUNG
JERIJEH LIGHTHOUSE - UNLIT |
9th JANUARY 2009 |
| 4/2009(T) |
THE
CONTAINERS DROPPED INTO THE SEA |
13th JANUARY 2009 |
| 5/2009(T) |
KUALA
KEMENA , FAIRWAY BUOY - MISSING |
18th JANUARY 2009 |
| 6/2009(T) |
BINTULU
PORT, BUOYS - MISSING |
19th JANUARY 2009 |
| 7/2009(T) |
F23
VENT PLATFORM NAVIGATION AIDS, OFFSHORE SARAWAK |
19th JANUARY 2009 |
| 8/2009(T) |
DRILLING
OPERATION, OFFSHORE SARAWAK |
20th JANUARY 2009 |
| *9/2009 |
BINTULU
- WRECK |
29th JANUARY 2009 |
| *10/2009 |
TANJUNG
JERIJEH LIGHTHOUSE – RESUMED OPERATION |
2nd FEBRUARY 2009 |
| 11/2009(T) |
KUALA
RAJANG, BUOY NO. 3 - UNLIT |
3rd FEBRUARY 2009 |
| 12/2009(T) |
BINTULU
PORT, SOUTH ACCESS CHANNEL, BUOY J - MISSING |
4th FEBRUARY 2009 |
| *13/2009 |
MIRI
- WRECK |
5th FEBRUARY 2009 |
| 14/2009(T) |
JERIJEH
SOUTH BEACON - COLLAPSED |
13th FEBRUARY 2009 |
| 15/2009(T) |
BEACONS
- COLLAPSED |
17th FEBRUARY 2009 |
| 16/2009(T) |
“MARINE
SITE HAZARD SURVEY”, OFFSHORE SARAWAK |
25th FEBRUARY 2009 |
| 17/2009(T) |
DERRICK
BARGE, ‘DB-30’ ARRIVES AT B11 & F6 FIELDS,
OFFSHORE SARAWAK |
12th MARCH 2009 |
| *18/2009 |
TANJUNG
JERIJEH SOUTH BEACON - RECONSTRUCTED |
24th MARCH 2009 |
| 19/2009(T) |
KUALA
SANTUBONG – MICHELLE NO.1 – BUOY MISSING |
26th MARCH 2009 |
| *20/2009 |
KUALA
SEMATAN - NEW TRANSIT BEACONS |
31th MARCH 2009 |
| 21/2009(T) |
BATU
KERA BEACON (KUALA SANTUBONG) - COLLAPSED |
1st APRIL 2009 |
| *22/2009 |
KUALA
SANTUBONG - WRECK |
3rd APRIL 2009 |
| 23/2009(T) |
SEMI
- SUB TENDER ASSIST DRILLING RIG ‘WEST ALLIANCE’ MOVES FROM
EXISTING PLATFORMS, SCDR-A TO BADP-E (PCSB), OFFSHORE SARAWAK |
6th APRIL 2009 |
| *24/2009 |
KUALA
RAJANG, BUOY NO. 3 - RESUMED OPERATION |
8th APRIL 2009 |
| 25/2009(P) |
SUNGAI
SARAWAK – SALVAGING, REMOVAL AND DISPOSAL OF WRECK ‘SASACOM
1’ |
15th APRIL 2009 |
| *26/2009 |
KUALA
BARAM, MIRI - WRECK |
20th APRIL 2009 |
| 27/2009(T) |
SEISMIC
SURVEY AT BLOCK BALINGIAN G4, OFFSHORE SARAWAK |
27th APRIL 2009 |
| 28/2009(T) |
WAVESCAN
DEPLOYMENT AT BLOCK E, OFFSHORE SARAWAK |
27th APRIL 2009 |
| *29/2009 |
KUALA
SANTUBONG - WRECK - DELETED |
27th MARCH 2009 |
| 30/2009(T) |
OIL
SPILL RESPOND TRAINING AND EXERCISE DRILL LEVEL -1 ‘Operator Level
and On-Scene Coordinator’ |
28th APRIL 2009 |
| 31/2009(P) |
GAS
PLATFORMS INSTALLATION WORKS – GOPA & GOPB, OFFSHORE BINTULU,
SARAWAK |
29th APRIL 2009 |
| *32/2009 |
SAR
421 – KUALA BARAM – NEW EDITION CHART |
29th APRIL 2009 |
| *33/2009 |
KUALA
BARAM - RE-LOCATION OF CHANNEL BUOYS |
29th APRIL 2009 |
| 34/2009(T) |
KUALA
BARAM, CHANNEL BUOY NO. 2 - MISSING |
4th MAY 2009 |
| *35/2009 |
KUALA
SEMATAN - FAIRWAY BUOY - DELETED |
4th MAY 2009 |
| 36/2009(T) |
SEISMIC
SURVEY AT BLOCK BALINGIAN, OFFSHORE SARAWAK |
11th MAY 2009 |
| *37 / 2009 |
BATU
KERA (KUALA SANTUBONG) – BEACON RECONSTRUCTED |
19th MAY 2009 |
| 38/2009(P) |
KUMANG
CLUSTER GAS FIELD DEVELOPMENT PROJECT PHASE 1 - PIPELINE INSTALLATION WORKS
FROM KUMANG (KUJT-A) TO KANOWIT (KAKG -A) (18”pipelines) & FROM
KAKG-A TO MLNG 2 (28” pipelines) |
19th MAY 2009 |
| 39/2009(T) |
2D
SEISMIC SURVEY, OFFSHORE SARAWAK |
19th MAY 2009 |
| 40/2009(T) |
“MARINE
SITE HAZARD SURVEY”, OFFSHORE SARAWAK |
4th JUNE 2009 |
| 41/2009(T) |
BINTULU
PORT, SOUTH ACCESS CHANNEL - BUOY F - UNLIT |
15th JUNE 2009 |
| *42/2009 |
BINTULU
PORT, NAVIGATIONAL BUOYS - RESUMED OPERATION |
15th JUNE 2009 |
| 44/2009(T) |
GEOSTREAMER
TEST FOR 2D SEISMIC ACQUISITION AT BLOCK 2C AND BLOCK SK310, OFFSHORE SARAWAK |
19th JUNE 2009 |
| 45/2009(T) |
KUCHING
BARRAGE – UNSCHEDULED RAISE WATER LEVEL TO 9.4 m (LSD +1.4m) AND SUBSEQUENT
DRAIN DOWN TO 7.5 m (LSD - 0.5m) ON 24TH JUNE 2009 (WEDNESDAY) |
22th JUNE 2009 |
| 46/2009(T) |
“GEOHAZARD
MARINE SURVEY”, OFFSHORE SARAWAK |
22th JUNE 2009 |
| 47/2009(T) |
SOIL
BORING VESSEL MV TEKNIK SAMUDERA ARRIVES AT LAILA, F29 AND F14 FIELDS, OFFSHORE
SARAWAK |
30th JUNE 2009 |
| 48/2009(P) |
JACKET
INSTALLATION WORKS – F9JT-A & KUJT-A
(KUMANG CLUSTER), OFFSHORE SARAWAK |
1st JULY 2009 |
| *49/2009 |
NORTH
ACCESS CHANNEL, BINTULU PORT – TRANSIT 28A & 28B |
6th JULY 2009 |
| 50/2009(T) |
TANJUNG
EMBANG REAR LIGHTS - UNLIT |
9th JULY 2009 |
| 51/2009(T) |
THE
CONSTRUCTION WORKS FOR SIBU / BAWANG ASSAN / SERDENG ROAD (PACKAGE II: FROM
SG. LOBA SATUBAH TO SERDENG ROAD) |
20th JULY 2009 |
| 52/2009(T) |
DERRICK
BARGE, BD-30 ARRIVES AT B 11 & F 23 FIELDS, OFFSHORE SARAWAK |
21th JULY 2009 |
| 53/2009(T) |
M03
NAVIGATION AIDS, OFFSHORE SARAWAK - NOPERATIVE |
21th JULY 2009 |
| 54/2009(T) |
MV
MILLION WRECK BUOY - UNLIT |
23th JULY 2009 |
| 55/2009(T) |
KUALA
BARAM, BUOY NO. 1 - MISSING |
23th JULY 2009 |
| *56/2009 |
TANJUNG
EMBANG BEACON (REAR LIGHT) - RESUMED OPERATION |
29th JULY 2009 |
| 57/2009(T) |
2D
SEISMIC SURVEY, OFFSHORE SARAWAK |
7th AUGUST 2009 |
| 58/2009(P) |
WEST
LUTONG OIL FIELD - PIPELINE INSTALLATION WORKS FROM WLP-A TO MCOT ((Replacement) |
10th AUGUST 2009 |
| 59/2009(P) |
PLATFORM
INSTALLATION WORKS (Topsides) – B11 RE-DEVELOPMENT PROJECT, OFFSHORE
SARAWAK |
10th AUGUST 2009 |
| 60/2009(T) |
TANJUNG
PO, BUOY NO. 8 - UNLIT |
19th August 2009 |
| 61/2009(T) |
PROPOSED
PIPELINE ROUTE SURVEY, OFFSHORE SARAWAK |
04th June 2009 |
| 62/2009* |
KUALA
SANTUBONG, MICHELLE 1 – WRECK BEACON RECONSTRUCTED |
20th August 2009 |
| 63/2009(T) |
BEACON
NO. 1, MUARA TEBAS - UNLIT |
20th August 2009 |
| 64/2009* |
NEW
GAS PLATFORM (JACKET), SEPA – OFFSHORE BINTULU SARAWAK |
25th August 2009 |
| 65/2009(T) |
DRILLING
OPERATION, OFFSHORE SARAWAK |
24th August 2009 |
| 66/2009(T) |
REPAIRS
OPERATION FOR MALAYSIA DOMESTIC SUBMARINE CABLE SYSTEM (MDS), OFFSHORE SARAWAK
|
4th September 2009 |
| 67/2009(T) |
AMENDMENT
TO SARAWAK NTM NO. 66/2009(T) |
08th September 2009 |
| 68/2009(P) |
JACKET
INSTALLATION WORKS (Topside) – F9JT-A, KUJT-A & KAKG-A, (KUMANG CLUSTER),
OFFSHORE SARAWAK |
10th September 2009 |
| 69/2009(T) |
TANJUNG
PO, BUOY NO. 2 - UNLIT |
14th September 2009 |
| 70/2009* |
KUALA
MUKAH – ISOLATED DANGER MARK BUOY |
14th September 2009 |
| 71/2009(T) |
2D
SEISMIC SURVEY, OFFSHORE SARAWAK |
17th September 2009 |
| 72/2009(T) |
BINTULU
PORT, SOUTH ACCESS CHANNEL, BOUY O - MISSING |
29th September 2009 |
| 73/2009(T) |
SITE
SURVEY CAMPAIGN AT F14DR-A, G16-A & BUAH NAGA-A, OFFSHORE SARAWAK |
29th September 2009 |
| 74/2009(P) |
D30
& DANA FIELD DEVELOPMENT PROJECT - PIPELINE INSTALLATION WORKS FROM DANA
FIELD TO D35 PLATFORM |
29th September 2009 |
| 75/2009* |
KUALA
BARAM - WRECK |
8th October 2009 |
| 76/2009(T) |
BINTULU
PORT, SOUTH ACCESS CHANNEL, BUOY J - MISSING |
15th October 2009 |
| 77/2009(T) |
BATANG
PALOH - HAZARD AT MUARA SERDENG |
22nd October 2009 |
| 79/2009 |
KUALA SEMATAN - FAIRWAY BUOY - RE-ESTABLISHED |
15th October 2009 |
| 80/2009 |
BATANG
PALOH - HAZARD AT MUARA SERDENG |
22nd October 2009 |
| 81/2009(T) |
TG. BATANG MAROU BEACON - COLLAPSED |
16th November 2009 |
| 82/2009(T) |
SEMI - SUB DRILLING RIG ‘ATWOOD FALCON’ MOVES FROM GUMUSUTDC-A TO G15-A, OFFSHORE SARAWAK |
16th November 2009 |
| 83/2009(T) |
“MARINE GEOHAZARD SURVEY”, OFFSHORE SARAWAK |
16th November 2009 |
| 84/2009(T) |
BINTULU PORT, SOUTH ACCESS CHANNEL, BUOY I - MISSING |
20th November 2009 |
| 85/2009(T) |
SEMI - SUB TENDER ASSIST DRILLING RIG ‘WEST ALLIANCE’ MOVES FROM EXISTING PLATFORMS, JNDR-A TO F13EDR-A, OFFSHORE SARAWAK |
2 December 2009 |
| 86/2009 |
TANJUNG DATU - WRECK |
2 December 2009 |
| 87/2009(T) |
“MARINE GEOHAZARD SURVEY”, OFFSHORE SARAWAK |
30 December 2009 |
| 88/2009(T) |
AMENDMENT TO SARAWAK NTM No. 87/2009(T) |
30 December 2009 |