| Notice
No. |
Title |
Date |
| 1/2009 |
LIST
OF NOTICES TO MARINERS STILL IN FORCE |
7th JANUARY 2009 |
| 2(T)/2009 |
MARINE
SITE HAZARD SURVEY |
9th JANUARY 2009 |
| 3(T)/2009 |
PRE-SPUD AT SIGAPON FIELD, OFFSHORE SABAH |
9th JANUARY 2009 |
| 4/2009 |
JACK UP RIG 'DD3' LEAVING SJJT-H EXISTING PLATFORM |
9th JANUARY 2009 |
| 5/2009 |
SEMI-SUB DRILLING 'ATWOOD FALCON' LEAVING PETAI-B1 FIELD - OFFSHORE SABAH |
9th JANUARY 2009 |
| 6(T)/2009 |
DRILLING OPERATION |
22nd JANUARY 2009 |
| 7(T)/2009 |
JACK UP RIG 'OFFSHORE COURAGES' ARRIVES SJJT-H EXISTING PLATFORM, OFFSHORE SABAH |
23rd JANUARY 2009 |
| 8(T)/2009 |
COASTAL HYDRAULIC AND SEDIMENTATION SURVEY |
30th JANUARY 2009 |
| 9(T)/2009 |
SEMI-SUB DRILLING RIG 'ATWOOD FALCON' MOVES FROM SINGAPORE TO SIGAPON LOCATION, OFFSHORE SABAH |
10th FEBRUARY 2009 |
| 10(T)/2009 |
3D SEISMIC SURVEY |
27th FEBRUARY 2009 |
| 11(T)/2009 |
DRILLING OPERATION |
23rd MARCH 2009 |
| 12(T)/2009 |
MARINE SITE HAZARD SURVEY |
20th APRIL 2009 |
| 13(T)/2009 |
DRILLING OPERATION |
6th MAY 2009 |
| 14/2009 |
SEMI-SUB
DRILLING RIG 'ATWOOD FALCON' LEAVING SIGAPON-1 FIELD, OFFSHORE SABAH |
06th MAY 2009 |
| 16(T)/2009 |
DRILLING RIF PRE-LAID ANCHORS MOORING AT GIMUSUT FIELD, OFFSHORE SABAH |
06th MAY 2009 |
| 18(T)/2009 |
3D SEISMIC SURVEY |
11th MAY 2009 |
| 20(T)/2009 |
DRILLING OPERATION |
19th JUNE 2009 |
| 21(T)/2009 |
SEMI-SUB DRILLING RIG AT 'ATWOOD FALCON' MOVES FROM GIMUSUT FIELD DC-B TO GIMUSUT DC-A, OFFSHORE SABAH |
19th JUNE 2009 |
| 22(T)/2009 |
JACK UP RIG 'OFFSHORE COURAGES' MOVING OFF FROM SJJT-G EXISTING PLATFORM TO KNDP-A EXISTING FLATFORM, OFFSHORE SABAH |
19th JUNE 2009 |
| 23(T)/2009 |
GEOHAZARD MARINE SURVEY |
10th JULY 2009 |
| 24(T)/2009 |
WATER PIPELINE LAYING OPERATION |
15th JULY 2009 |
| 25(T)/2009 |
SOIL BORING OPERATION AT SABAH OIL AND GAS TERMINAL (SOGT) KIMANIS, SABAH |
31st JULY 2009 |
| 26(T)/2009 |
HYDRAULIC AND SEDIMENTATION STUDY AT VICINITY OF PAPAR RIVER, PAPAR SABAH |
5th AUGUST 2009 |
| 27/2009 |
JACK UP RIG 'OFFSHORE COURAGES' LEAVING SJJT-G EXISTING PLATFORM, OFFSHORE SABAH |
5th AUGUST 2009 |
| 28(T)/2009 |
DRILLING OPERATION |
19th AUGUST 2009 |
| 29(T)/2009 |
DRILLING OPERATION |
19th AUGUST 2009 |
| 30(T)/2009 |
NAVTEX SYSTEM TEMPORARILY OUT OF SERVICES |
25th AUGUST 2009 |
| 31(T)/2009 |
DRILLING OPERATION |
15th SEPTEMBER 2009 |
| 32(T)/2009 |
DRILLING OPERATION |
7th OCTOBER 2009 |
| 33(T)/2009 |
GEOTECHNICAL INVESTIGATION AT MALIKAI FIELD, OFFSHORE SABAH |
7th OCTOBER 2009 |
| 34(T)/2009 |
SEMI-SUB DRILLING RIG "ATWOOD FALCON" MOVES FROM GUMUSUT DC-A TO GUMUSUT DC-C, OFFSHORE SABAH |
23 OCTOBER 2009 |
| 35(T)/2009 |
SUBMARINE POWER CABLE LAYING OPERATION |
2 NOVEMBER 2009 |
| 36(T)/2009 |
WATER PIPELINE RECOVERY WORKS AND LAYING OPERATION |
2 NOVEMBER 2009 |
| 37(T)/2009 |
HYDRAULIC AND SEDIMENTATION STUDY AT THE VICINITY AT TELUK PEDAS, SABAH |
7 DECEMBER 2009 |
| 38(T)/2009 |
DRILLING OPERATION |
15 DECEMBER 2009 |
| 39(T)/2009 |
SEMI-SUB DRILLING RIG "ATWOOD FALCON" MOVES FROM GUMUSUT DC-A TO GUMUSUT DC-C HAS BEEN CANCELLED, OFFSHORE SABAH |
15 DECEMBER 2009 |
| 40(T)/2009 |
JACK-UP RIG "OFFSHORE COURAGEOUS" LEAVING KNDP-A EXISTING PLATFORM, OFFSHORE SABAH |
15 DECEMBER 2009 |
| 41(T)/2009 |
SEMI-SUB DRILLING RIG "ATWOOD FALCON" MOVES FROM G15-A OFFSHORE SARAWAK TU UBAH-4, OFFSHORE SABAH |
15 DECEMBER 2009 |
| 42(T)/2009 |
PRE-SPUD ACTIVITY AT UBAH-4, OFFSHORE SABAH |
15 DECEMBER 2009 |
| 43(T)/2009 |
MARINE GEOHAZARD SURVEY |
17 DECEMBER 2009 |
| 44(T)/2009 |
MV. MARKAB LEAVES MALIKAI FIELD, OFFSHORE SABAH |
17 DECEMBER 2009 |
| 45(T)/2009 |
MARINE GEOHAZARD SURVEY |
22 DECEMBER 2009 |
| 46(T)/2009 |
MV. MARKAB LEAVES MALIKAI FIELD, OFFSHORE SABAH |
31 DECEMBER 2009 |