Notis Kepada Pelaut

Tarikh Pembatalan Fail Pembatalan
14 July 2020 | NTM 58/2020(T)
Inner Buoy, Muara Lassa – Missing
14 July 2020 | NTM 57/2020(T)
Ship Movement Activities At D18jt-D Complex For D18 Field Development Project , Offshore Sarawak
13 July 2020 | NTM 111 (T)/2020
Hydrographic Survey Terengganu Waters
12 July 2020 | NTM110(T)/2020
Sand Mining Operation Johor Waters
11 July 2020 | NTM 107(T)/2020
Kertih N2 Bouy Unlit Kertih Port, Terengganu
11 July 2020 | NTM 108(T)/2020
Paton Bank Kertih Bouy Unlit Kertih Port, Terengganu
11 July 2020 | NTM 109(T)/2020
Kertih Port No 7r Bouy Unlit Kertih Port, Terengganu
9 July 2020 | NTM 56/2020(T)
Buoy I, South Access Channel, Bintulu Port- Missing
9 July 2020 | NTM 106T/2020
Underwater Pipeline Installation South China Sea
9 July 2020 | NTM 105/2020
Kuala Terengganu Fairway Light Buoy Restored To Normal Kuala Terengganu, Terengganu
8 July 2020 | NTM 13 (T) /2020
Corrigendum To NTM 11 (T)/2020
8 July 2020 | NTM 104/2020
Pulau Cipu Light Beacon Restored To Normal Pulau Redang - Tumpat
8 July 2020 | NTM 103(T)/2020
Kuala Terengganu Fairway Light Buoy Unlit Kuala Terengganu, Terengganu
Wednesday, 8 July 2020 Notis Pembatalan NTM 103(T)/2020
6 July 2020 | NTM 102(T)/2020
Kertih Port Sea Buoy Unlit Kertih Port, Terengganu
6 July 2020 | NTM 101/2020
Kemaman Breakwater North Beacon Restored To Normal South China Sea
6 July 2020 | NTM 11(T)/2020
Offshore Geophysical Survey & Seabed Soil Sampling Activities
3 July 2020 | NTM 55
GEOHAZARD SITE INVESTIGATION ( PIPELINE ROUTE SURVEY) AND GEOTECHNICAL INVESTIGATION (SOIL BORING) AT MEDAN LANG LEBAH, BLOCK SK410B, OFFSHORE SARAWAK
3 July 2020 | NTM 100(T)/2020
Pulau Cipu Light Beacon Unlit Pulau Redang - Tumpat
Friday, 3 July 2020 Notis Pembatalan NTM 100(T)/2020
2 July 2020 | NTM 99(T)/2020
Repair And Maintenance Work For Thailand – Indonesia Singapore Cable System Offshore Johor
1 July 2020 | NTM 10 (T) / 2020
Offshore Drilling Operation