10:14:04 PM | 05-Aug-2020
Bantuan | Pejabat Laut ENGLISH | BAHASA MALAYSIA
Laman Utama Hubungi Kami Peta Google
Notis / Notis Kepada Pelaut / /
 

Wilayah Sarawak 2010

 

Arkib

Semua notis adalah dalam format PDF. Anda perlu menginstalasi aplikasi Acrobat Reader untuk memaparkan notis.
 
No. Notis Tajuk Tarikh
NTM 64/ 2010(P) Lutong Wreck Buoy, Miri - Resumed Operation 17 Disember 2010
NTM 63/ 2010(P) Installation of Tubing Head Spool and Christmas tree In Gumusut Field, Offshore Sabah 8 Disember 2010
NTM *62/ 2010 Off Tanjung Manis, Sarawak, Submarine Cables Non-Anchorage Area 30 September 2010
NTM *61/ 2010 West Patricia & Golok Oil Fields, Offshore Sarawak - Mooring Buoys - Established 19 November 2010
NTM *60/ 2010 Sungai Sarawak- West Cardinal Mark, Sasacom - Deleted 19 November 2010
NTM *59/ 2010 Kuala Kemena, Bintulu - Navigational Buoys - Re-Established 19 November 2010
NTM 58/ 2010(T) Extension of NTM *47/2010(T) - 3d Seismic Survey, Block E Zig Zag, Offshore Sarawak 2 November 2010
NTM 57/ 2010(T) Semi - Sub Drilling Rig 'Atwood Falcon' Moving From F08n-A Location, Offshore Sarawak To Gumusut Dc-B, Offshore Sabah 2 November 2010
NTM *56/ 2010 Amendment to Sarawak NTM No. *49/2010 2 November 2010
NTM 55/ 2010(T) Kuala Paloh - Port-Hand Buoy - Out Of Position 26 Oktober 2010
NTM 54/ 2010(T) Off Kuala Bintulu - Wreck 22 Oktober 2010
NTM 53/ 2010(T) "Marine Geohazard Survey", Offshore Sarawak 19 Oktober 2010
NTM 52/ 2010(T) Semi - Sub Drilling Rig 'Atwood Falcon' Moving From F10ne Location to F08N-A Location, Offshore Sarawak 19 Oktober 2010
NTM 51/ 2010(T) Tanjung Manis, Kuala Rajang - Beacons Collapsed 14 Oktober 2010
NTM *50/ 2010 Kuala Rajang and Kuala Paloh - Navigational Buoys - Established 14 Oktober 2010
NTM *49/ 2010 Addendum to the Notice to Mariners No. *48/2010 - 'Off Tanjung Manis, Sarawak, Submarine Cables - Non-Anchorage Area' 11 Oktober 2010
NTM *48/ 2010 Off Tanjung Manis, Sarawak, Submarine Cables - Non-Anchorage Area 30 September 2010
NTM 47/ 2010(T) 3D SEISMIC Survey, Block E Zig Zag, Offshore Sarawak 20 September 2010
NTM 46/ 2010(T) Off Tanjung Sirik - Wreck 20 September 2010
NTM *45/ 2010 Bintulu Port, South Access Channel, Buoy J - Resumed Operation 6 September 2010
NTM 44/ 2010(T) 3D SEISMIC Survey, Block SK315, Offshore Sarawak 26 Ogos 2010
NTM 43/ 2010(T) Marine Geohazard Survey, Bokor Fields, Offshore Sarawak 26 Ogos 2010
NTM *42/ 2010 Nearshore Pipeline Established, Sabah 24 Ogos 2010
NTM 41/ 2010(T) SEISMIC Survey at Block SK 320, Offshore Sarawak 24 Ogos 2010
NTM 40/ 2010(T) Bintulu Port, South Access Channel, Buoy J - Missing 4 Ogos 2010
NTM 39/ 2010(T) Semi - Sub Tender Assist Drilling Rig 'West Alliance' Moves From Existing Platforms E8dr-A, Offshore Sarawak to Singapore 3 Ogos 2010
NTM 38/ 2010(T) Drilling Operations at Block SK 310, Offshore Sarawak 3 Ogos 2010
NTM 37/ 2010(T) Laying Of Submarine Pipeline across Batang Paloh, Mukah Division, Sarawak 3 Ogos 2010
NTM 36/ 2010(T) Sarikei - Dangerous Wreck 19 Julai 2010
NTM *35/ 2010 Kuala Kemena - Wreck Beacon - Reconstructed 8 Julai 2010
NTM *34/ 2010 Replacement of Permanent Mooring Buoy System nearby Helang Integrated Platform, Offshore Sarawak 6 Julai 2010
NTM *33/ 2010 Batu Kera (Kuala Santubong) - Beacon Reconstructed 28 Jun 2010