Scale of Fees for Hydrographic Surveys
1. Mobilisation/Demobilisation
1.1 Fuel RM 0.90/Km
1.2 Surveys Vessel (KJLS MERPATI) RM3,650.00/day
2. Control Survey
2.1 Horizontal Control (15% DR) RM1,571.00/Station
2.2 Vertical Control (15% DR) RM1,571.00/Station
3. Sounding
3.1 Sounding (basic pattern cover) RM 326.87/Km
3.2 Investigation (shoal, wreck etc.) RM 436.00/Km
3.3 Consummables (echo sounder) RM 350/roll
4. Coastlining
4.1 Seaward limit of vegetation taken as the
coastline (10% DR) RM1,047/Km
4.2 Demarcation of high water line by walking over (20% DR) RM 2,095/Km
5. Final Reports 5 - 10% Total Cost
6. Miscellaneous (eg. Airfare, survey team movement etc.) RM1,000.00/day
7. Standby / bad weather / spare day (for survey exceeding seven (7) days) RM10,477.00/day
For Calculation; * Daily Rate = RM10,470.00